# 127113

Director of Operations – Arizona Expansion

Mesa, Arizona
Construction(Industrial)
Willing to Travel: No
Willing to Relocate: Local, Regional, National

Profile and Projects

SEMICONDUCTOR: Cleanroom Expansion, Chandler, AZ – Electrical Infrastructure Upgrade, Multi-Phase Cleanroom Build – $40M (Led 300+ personnel, implemented AI-driven scheduling for 30% downtime reduction).
SEMICONDUCTOR: Tool Installations, Multiple Sites, AZ – High-Precision Tool Installation, 500+ Tools – $10M (Directed operations, optimized sequencing to reduce installation time by 20%).
SEMICONDUCTOR: Facility Expansion & Utility Upgrades, Chandler, AZ – Mission-Critical Infrastructure, Sub-Fab and Cleanroom Utilities – $5M (Oversaw utility-scale projects, ensured ISO/OSHA compliance).
BIOPHARMACEUTICAL: Biomerics Facility Expansion, Monroe, CT – Site Development, Medical Device Manufacturing Facility – $26M (Managed contractor coordination, ensured GMP compliance).
HEALTHCARE: ABC Autism Therapy Centers, 35 Locations Across 8 States – Ground-Up and Tenant Improvements, Specialized Therapy Facilities – $65M (Led multi-state project execution, focused on San Antonio market).
HEALTHCARE: Renumedic Project, San Antonio, TX – Tenant Improvement, Healthcare Facility Upgrade – $2M (Directed project delivery, aligned with client’s operational goals).

HEALTHCARE: Surgical Suite Renovation, Kirtland AFB, NM – Hospital Infrastructure Upgrade, MRI/Sterile/OR Processing – $24M (Directed renovation, increased treatment capacity by 50%).
MISSION-CRITICAL: Aeromedical Evacuation Logistics, Ramstein AB, Germany/Djibouti, Africa – Equipment Maintenance Across 4 Countries, 2,000+ Assets – $13M (Managed logistics, achieved 96% readiness).
SCIENTIFIC RESEARCH: National Science Foundation Support, McMurdo/South Pole, Antarctica – Medical Equipment Maintenance, 150 Devices – $1M (Provided strategic maintenance, supported 2,700 individuals).
HEALTHCARE: Disaster Recovery Post-Earthquake, Joint Base Elmendorf, AK – Facility Restoration, 13 Medical Facilities (1.1M SF) – $5M (Led recovery, resumed operations in <48 hours).
HEALTHCARE: Global Military Equipment Readiness, Ramstein AB, Germany – Equipment Maintenance, 2,000+ Assets – $13M (Reduced turnaround time by 93%, cleared 3-month backlog).
HEALTHCARE: Medical Treatment Facility Upgrade, Joint Base Elmendorf, AK – Asset Acquisition, 171 New Assets – $1.9M (Oversaw acquisition, cut referral costs by $1.9M).
RESEARCH: ASU Solar Laboratory Power Upgrade, Tempe, AZ – Electrical Expansion, Solar Research Facility – $50K (Designed power systems, ensured operational efficiency).
AEROSPACE: Honeywell Aerospace Facility Upgrade, Phoenix, AZ/Mexicali, Mexico – Power System Upgrade, Wind Turbine Manufacturing – $125K (Led design and execution, supported turbine expansion).
INDUSTRIAL: Salt River Project West Valley, Phoenix, AZ – Generator Replacement, Electrical Infrastructure – $25K (Managed project lifecycle, ensured NFPA/OSHA compliance).
INDUSTRIAL: Mission Foods, Tempe, AZ – Warehouse Renovation, Office and Sanitation Washdown Facility – $50K (Managed renovations, improved facility functionality).
INDUSTRIAL: Salt River Project XCT Garage Bldg. #32, Phoenix, AZ – Power Distribution Design, Ethanol Fuel Infrastructure – $30K (Designed electrical systems, supported fuel operations).

P6, MS Projects, OSHA, USACE-Safety, DoD Secret Clearance, DoD-METC, GMP/FDA Compliance

Name
Max. file size: 300 MB.

Meet Your Consultant