# 124308

Founder CEO

La Quinta, California
Construction(Industrial)
Willing to Travel: Yes
Willing to Relocate: Yes

Profile and Projects

• Pepperdine University, Outer Precinct Hall, Malibu, CA – Ground-up, CMAR, 462-bed residence hall, 9,000 SF podium, utility upgrades, multi-phase delivery, scheduling, safety, and client interface – $50,000,000 (Project Superintendent, MAR 2016 – APR 2018)
• Richard J. Donovan Correctional Facility, San Diego, CA – Ground-up, Design-Build, 792-bed semi-autonomous facility, 317,000 SF, housing units, healthcare, visitation, support spaces, safety, and subcontractor management – $170,000,000 (Building Superintendent, APR 2014 – FEB 2016)
• Corrections Corporation of America – Otay Mesa Detention Facility, Otay Mesa, CA – Ground-up, Design-Bid-Build, 1,492-bed detention facility, 350,000 SF, perimeter fencing, lighting, and parking, subcontractor coordination and QC – $89,006,855 (Field Engineer, NOV 2014 – JUL 2015)
• Scripps HR Relocation Project, San Diego, CA – Remodel, CMAR, 12,000 SF, fire life safety systems, casework, storefront, restrooms, IDF closet, construction coordination, and client reporting – $880,916 (Project Engineer, DEC 2013 – APR 2014)
• Abbott Laboratories Phase 5B Cafeteria, Temecula, CA – Ground-up, CMAR, commercial dining facility, ventless exhaust, cook line, counters, flooring, document control, and team coordination – $800,000 (Project Engineer, DEC 2013 – APR 2014)
• Abbott Laboratories Phase 6 Building A & C Demo, Temecula, CA – Demolition, CMAR, 150,000 SF & 25,000 SF, manufacturing facilities, landscaping, ADA upgrades, paving, and grease trap rerouting – $1,200,000 (Project Engineer, NOV 2013 – APR 2014)
• Amgen B-15 Cardiovascular Arrhythmia Research Lab Renovation, Thousand Oaks, CA – Renovation, CMAR, demolition of flooring, walls, and systems; upgrades to medical gas outlets, electrical, mechanical, and fire safety systems – $600,000 (Project Engineer, FEB 2013 – MAY 2013)
• Amgen B-31 Risk Mitigation, Thousand Oaks, CA – Risk Mitigation, Design-Build, seismic upgrades to mechanical systems, fire sprinklers, redundant energy, and process piping – $10,000,000 (Project Engineer, FEB 2013 – JUL 2013)
• UCSD Blake Hall Fire and Life Safety Upgrade, San Diego, CA – Renovation, CMAR, on-campus housing, storm and sanitary rerouting, fire service connection, ADA restrooms, and LEED Silver Certification – $5,000,000 (Project Engineer, JUN 2013 – SEP 2013)
• UCSD Tenaya Hall Fire and Life Safety Upgrade, San Diego, CA – Fire Safety, CMAR, fire alarm and sprinkler installation, exterior concrete repairs, and minor architectural upgrades – $1,200,000 (Project Engineer, JUN 2013 – SEP 2013)
• Celgene San Diego Facility, San Diego, CA – Tenant Improvement, CMAR, 170,000 SF LEED Gold, biology/chemistry labs, vivarium, cold rooms, NMR, data center, and 750kW generator with bulk N2/CO2 storage – $40,000,000 (Project Engineer, APR 2012 – FEB 2013)
• Loma Linda University Medical Center – East Campus Electrical Upgrade and Patio Renovation, Redlands, CA – Renovation, CMAR, emergency power upgrades, new lighting, restrooms, sidewalks, landscaping, patios, and nurse call devices – $400,000 (Project Engineer, SEP 2011 – MAY 2012)
• Loma Linda University Medical Center Behavioral Medicine Center, Redlands, CA – Cosmetic Upgrade, CMAR, 21,976 SF, new carpet, flooring, and paint completed off-hours – $300,000 (Project Engineer, OCT 2011 – FEB 2012)
• Loma Linda University Medical Center Cardiovascular Lab UPS Install, Loma Linda, CA – Electrical Upgrade, CMAR, installation of 275kVA UPS, relocation of chilled supply lines, and critical care support systems – $400,000 (Project Engineer, DEC 2010 – APR 2011)
• Loma Linda University Medical Center, HSH Cath Lab Remodel, Redlands, CA – Remodel, CMAR, new medical gases, lighting, flooring, and med gas alarm panel with strict infectious control containment – $600,000 (Project Engineer, NOV 2010 – FEB 2011)
• Huntington Outpatient Service Pavilion, Pasadena, CA – Ground-Up, CMAR, four-story core and shell with coffee shop and pharmacy, utilities prepped for future tenant connections – $50,000,000 (Project Engineer Intern, JUN 2008 – SEP 2008)

• Primavera 6, Excel, Microsoft Word, Outlook, Class B General Contractor, Google Sketch, Bluebeam,

Name
Max. file size: 300 MB.

Meet Your Consultant