# 111427

Pre Construction Manager

Cincinnati, Ohio
Construction(Industrial)
Willing to Travel: No
Willing to Relocate: No

Profile and Projects

• WAREHOUSE: Mesa, AZ – Preconstruction and Proposal preparation for a 1,700,000 SF regional corporate headquarters and distribution hub to include Greenfield development, Warehouse space, truck courts, logistics space, and a 2-story corporate office
• AUTOMOTIVE MANUFACTURING: Little Rock, AR – Manufacturing Campus over 200+ acres with multiple buildings, site development, and infrastructure construction – $400M
• WAREHOUSE: FedEx Distribution Center in Arkansas – Ground Up – Express Distribution Facility – $30M
• FOOD PROCESSING: Wisconsin – DD and Phase 1 work for a New Automated Manufacturing Facility for Sargento Brands (Cheese products) – $225M
• INDUSTRIAL: Carbon Free CFC – Structural Additions and Upgrades at an Industrial Cooling Plant Facility – $8M
• MEDICAL OFFICE: Clinic MOB – Ground Up 56,000 SF, 4-story New Medical Office Building and associates site development – $25M
• OFFICE: Ohio – Renovations of multiple facilities for Call Centers, Scan Locations, and Corporate Offices – $2M
• HEALTHCARE: Memorial in Ohio – Renovations of existing MRI Suites – $1M
• HEALTHCARE: Medical in Ohio – Renovations of LINAC, MRI, and CT Patient and Public Area – $2M
• HEALTHCARE: Orthopedic One – Renovations of Multiple Locations across Ohio to include Scan Rooms, Offices, and Patient areas – $5M+
• HEALTHCARE: Cleveland Clinic – Renovations of multiple locations to include new Scan Rooms, Operating Rooms, Offices, and Patient areas with new GE equipment – $6M+
• HEALTHCARE: Health Village MRI Suite – Interior Renovation of an existing MRI Suite, Offices, Labs, and Patient areas to include new GE Equipment – $1M+
• HEALTHCARE: Dentistry in Tampa, FL – Construction of a new dentistry building including vacuum, oxygen, and med gas systems – $2M+
• TECHNOLOGY/ CLEAN ROOMS: Post Glover Lifelink – 13,000 SF Addition constructed of CMU Masonry and structural steel. Included interior renovations to include new Labs and Clean Rooms – $1.5M
• ENTERTAINMENT: Recreational Center in KY – 50,000 SF Recreational Facility with indoor trampoline park, duckpin bowling, restaurant, and gymnasium – $5M
• AUTOMOTIVE MANUFACTURING: BWI Manufacturing Facility in IN – Ground Up new 300,000 SF Manufacturing facility constructed of concrete tilt wall and structural steel. Project included interior Labs, Processing Rooms, and Office Finishes – $40M
• MANUFACTURING: Team EPS in KY – Ground Up New 100,000 SF Concrete Tilt Wall and Structural steel manufacturing facility – $8.5M
• FOOD PROCESSING: Smucker’s JIF New Tempering Warehouse in KY – Ground Up 78,000 SF Addition to existing manufacturing facility and interior office finishes – $8.5M
• HEALTHCARE: Professional Centre – Construction of a 68,000 SF 3-level post tension concrete parking garage and a 13,000 SF Infill Ambulatory Surgery Center – $6M
• PEMB WAREHOUSE: Air Freight Warehouse in KY – Design and Permitting of a 10,000 SF Addition constructed of CMU Masonry & Pre-engineered metal building – $530K
• TILT WALL WAREHOUSE: Warehouse in KY – Ground Up New 150,000 SF SPEC Warehouse constructed of tilt wall concrete and structural steel – $8M
• CHURCH: Baptist Church in Cincinnati, OH – Pre-construction, Budgets, and Design Management for new Church – $12M
• HIGHER EDCUATION: University of Kentucky Student Center in Lexington, KY – $2M
• HIGHER EDUCATION: University of Kentucky Academic Sciences Building in Lexington, KY – $6M
• MANUFACTURING: MUBEA USA in KY – New 74,000 SF Rolled Banks Facility – $22M
• K-12 EDUCATION: Cincinnati Public Schools – Elementary Addition & Renovation – $7.5M
• HOSPITALITY: Hampton Inn, Embassy Suites, Holiday Inn, Radisson to Sheraton, Quality Inn, WHI Hotels – Conversions, Ground Up, Additions, and Renovations up to $30M

OSHA 30, CPR/First Aid, Procore, Bluebeam, Primavera, Timberline, SureTrak, MS Office suites

Name
Max. file size: 300 MB.

Meet Your Consultant