# 120350

Senior Cost Estimator

Littleton, Colorado
Construction(Industrial)
Willing to Travel: No
Willing to Relocate: local

Profile and Projects

• WATER/UTILITIES Fire/Water Lines & Two Tanks – $8,900,000 – Senior Estimator – Poplar Bluff, MO – 95% Design – Bidding 7-8/2023, VA Med Center, MO, Disabled Vet Only
• HVAC Demo/Install Chiller Units – $3,500,000 – Senior Estimator II – Amarillo, TX – 95% Design – GC BID TBD, VA Med Center, TX, Disabled Vet Only
• HEALTHCARE Renovate 4 Operating Rooms – $6,700,000 – Senior Estimator – Beckley, WV – 90% Design – GC BID TBD, VA Med Center, WV, Disabled Vet Only
• EDUCATION Rebuild Engr Bldg. Shops – $5,000,000 – Senior Estimator – Waco, TX – 65% Design – GC BID TBD, VA Med Center, TX, Disabled Vet Only
• SANITATION CCC Sanitation District HQ – $35,000,000 – Senior Estimator II – Martinez, CA – Bidding 7/26/20, CCC District, Competitive Bid
• WATER/UTILITIES Marcy Gulch Lift Station – $10,000,000 – Senior Estimator II – Centennial, CO – CMAR/60% Dwgs, Centennial District, Negotiated/Bid
• UTILITIES San Mateo Utilities – $29,000,000 – Senior Estimator II – San Mateo, CA – Yard Piping, Competitive Bid
• WATER/UTILITIES Marcy Gulch Lift Station – $7,000,000 – Senior Estimator II – Centennial, CO – CMAR/90% Dwgs, Centennial District, Negotiated/Bid
• WATER/UTILITIES Lift Station, Force Main, Pond – $4,000,000 – Senior Estimator – Larkspur, CO – GC/SUB to Waner, Jellystone RV Parks, 2019-2020 Bid
• WATER/UTILITIES WWTP-Design-Build – $5,000,000 – Senior Estimator – Bozeman, MT – IWS Developer/Owner, 2019-2020 Neg
• WATER/UTILITIES Sky Ranch WW Reclaim Facility – $7,000,000 – Senior Estimator – Watkins, CO – IWS (low Bid), Rangeview Metro Dst, 2018-2019
• WATER/UTILITIES Pot Water/Water Recover/Irrg – $7,184,000 – Senior Estimator – Elizabeth, CO – IWS (low Bid), Independence W/S Dist., 2018-2019
• ENERGY Fuel Cell Demo Plant – $5,000,000 – Project Manager / Estimator – Cheyenne, WY – Velocity CI, Fuel Cell Energy, Select Bid/Added Gr
• WATER/UTILITIES Granby WTP – $6,000,000 – Senior Estimator – Granby, CO – Velocity CI, SGM, Inc, Competitive Bid
• WATER/UTILITIES Forest Lake WTP – $8,000,000 – Senior Estimator – Monument, CO – Velocity CI, Wright-Water Engrs, Competitive Bid
• INFRASTRUCTURE Office-Maint 6-Bay-Sand Shed – $5,500,000 – Senior Estimator – Divide, CO – Velocity CI, CDOT Maint Facility, Competitive Bid
• INFRASTRUCTURE Office-Maint 6-Bay-Sand Shed – $4,500,000 – Senior Estimator – Saguache, CO – Velocity CI, CDOT Maint Facility, Competitive Bid
• INFRASTRUCTURE Office-Maint 9-Bay-Sand Shed – $6,500,000 – Senior Estimator – Crowley County – Velocity CI, CDOT Maint Facility, Competitive Bid
• RENEWABLE ENERGY National Renewable Energy Labs – $4,500,000 – Chief Estimator/PM – Golden, CO – Multiple Designers, Multiple Projects
• RENEWABLE ENERGY NREL Wind Farm, Blade Test – $2,200,000 – Chief Estimator/PM – Golden/Jeffco, CO – CG Sub to GC, GC, Design-Builder
• WATER/UTILITIES 80’ Pre-eng Bldg. Air Stripper Plant – $5,000,000 – Chief Estimator/PM – Cheyenne, WY – CG Construction, Corps of Engineers, Select List
• INFRASTRUCTURE Statewide Mag Chloride Stations – $2,700,000 – Senior Estimator – 7 Locations – CDOT Phase 1, Competitive Bid
• INFRASTRUCTURE Statewide Mag Chloride Stations – $3,000,000 – Senior Estimator – 9 Locations – CDOT Phase 2, Competitive Bid
• RESIDENTIAL 11-story Post-Ten Housing – $10,000,000 – Class “A” Super – Denver/DU Campus – Clemens Const (3C), GC Owner/Developer Consultant
• WATER/UTILITIES Water Plant & Storage Tanks – $1,500,000 – PM/Estimator – Castle Rock, CO – NuWestern USA, Bell Mountain Ranch, Design-Build
• WATER/UTILITIES Actiflo Water Treatment Plant – $1,500,000 – PM/Est/Super – Golden, CO – NuWestern USA, North Table Mountain, Competitive Bid
• HEALTHCARE Hospital Cogen Plant – $5,000,000 – PM/Superintendent – Downtown Denver, CO – NuWestern USA, Enervest Co, Design-Build
• GOVERNMENT Army Reserve Center Remodel – $1,300,000 – PM/Superintendent – Boulder, CO – NuWestern USA, US Army Reserve, US Army Corps
• COMMERCIAL Office & Warehouse – $1,500,000 – PM/Superintendent – Aurora, CO – NuWestern USA, ABC Moldings, Inc, Design-Build
• COMMUNITY Historic Barn, Playground, Park – $2,000,000 – Project Manager – Greenwood Village, CO – NuWestern USA, City of Greenwood Village, Competitive Bid

HCSS for estimating WWTP, BlueBeam, OST, Excel, self-designed spreadsheets

Name
Max. file size: 300 MB.

Meet Your Consultant