Senior Superintendent
Profile and Projects
• MULTIFAMILY: Tasman East apartments, CA – 852,685 SF multi-family, Type 1A residential project consisting of 508 units, 570 parking stalls, and mixed-use commercial/retail space. The development includes mid-rise over podium garage and high-rise construction, with at-grade landscape design, civil engineering, and joint trench utilities. The project also features a 0.5-acre public park. $400M (Superintendent)
• HOTELS: Hyatt Place at 701 3rd Street, San Francisco, CA – 230-room, 120,000 SF full-service hotel near Oracle Park. LEED Platinum project featuring vegetated roofs, a greywater system, and sustainable mechanical systems. Includes a public courtyard at ground level and roof decks on the 9th and 12th floors. ($50M, Superintendent)
• THEATER: Ford Theatres renovation, Los Angeles, CA – Restoration of the historic 1,200-seat John Anson Ford Theatres, originally built in 1920. The project included extensive demolition, design-build shoring, fire suppression, new retaining walls, site drainage, below-stage expansion, theatrical AV and lighting, MEP system upgrades, and historic preservation. (Superintendent)
• OFFICE: 270 Brannan Splunk headquarters, San Francisco, CA – Demolition of an existing parking lot and two-story concrete structures for the construction of a 202,103 SF, 5-and-6-story Class A office space with one level of below-grade parking. The building is arranged around a central courtyard, split into two masses connected by the core, featuring a signature open glass rooftop canopy, outdoor seating, a water feature, and a living plant wall. ($100M, Superintendent)
• MULTIFAMILY: 1321 Mission, San Francisco, CA – 11-story, 160-unit residential tower on a tight urban site, with a single-level basement designed for efficient living. ($32M, Superintendent)
• OFFICE: 49 South Van Ness, San Francisco, CA – Ground-up, 530,129 SF steel structure office building for the San Francisco Department of Public Works. Includes two levels of below-grade parking, 16 levels of office space, and a one-stop shop permitting center for multiple city agencies. Project scope included demolition, shoring, excavation, and self-performed concrete work. ($220M, Superintendent)
• HEALTHCARE: UCSF Mt. Zion Medical Center, San Francisco, CA – Seismic improvements to Buildings B and D in an occupied facility. Interior retrofit work also performed in Building A as part of a multi-phased construction project. (Sr. Supt.)
• HEALTHCARE: Chinese Hospital 1979 building upgrades, San Francisco, CA – Electrical and mechanical infrastructure upgrade. Provided pre-construction design assist services, including exploratory demolition and BIM modeling. (Sr. Supt.)
• HEALTHCARE: Summit Alta Bates Medical Center, Oakland, CA – Multi-phased construction upgrades, including pharmacy and conference room renovations, locker room renovation (Phase 1 & 2), boiler replacement, and risk management upgrades. ($9.4M, Sr. Supt.)
• HEALTHCARE: California Pacific Medical Center, San Francisco, CA – Multi-phased construction and infrastructure upgrades, including a 50,000 SF women’s and children’s services consolidation ($20M), interventional endoscopy suite renovation ($3.5M), CT scanner and ultrasound upgrades ($3M), and an 8-story, 190,000 SF seismic upgrade at Davies Campus ($2.7M). Additional facility improvements included pediatric emergency department expansion and minor infrastructure upgrades. ($29.2M, Sr. Supt.)
OSHA 10, Procore, MS Project, BIM, P6,
Meet Your Consultant
We Create Real Connections
We find the person who meets and exceeds your unique hiring needs.

Let Us Represent Your Professional Vision
Scott Humphrey builds relationships that allow people and businesses to thrive.
