# 165805

Superintendent

Gilbert, Arizona
Construction (Commercial)
Willing to Travel: No
Willing to Relocate: Open to travel, Open for the right opportunity

Profile and Projects

MISSION CRITICAL: Microsoft Data Centers PHX 10–14, Goodyear, AZ – Ground-Up Hyperscale Campus, Steel Structure – 5 Buildings / 550,000+ SF Total / 36MW Each – Directed daily field operations, safety coordination, logistics, and QA/QC; managed 2,000+ trades; heavy crane and commissioning oversight – $60M Each (Assistant Superintendent – Skanska USA)

MISSION CRITICAL: EdgeCore Data Center EC Prime, Mesa, AZ – Tilt-Slab Ground-Up, Structural / Civil / MEP Integration – 2-Story Facility / 110,000 SF – Oversaw site development, utilities, envelope installation, and commissioning readiness – $20M (Assistant Superintendent – Skanska USA)

MISSION CRITICAL: Intel MSR-1 & MSR-2 (CH9 Project), Denver, CO – Secure Facility / SCIF & Cleanroom Construction – 77,000 SF Data Center / Process & Tool Install – Managed fabrication, raised floors, RF-shielded walls, and design-assist coordination; ensured uninterrupted Intel operations – $42M (Superintendent – Mazzuca Contracting)

INDUSTRIAL: FujiFilm Chemical Manufacturing Plant, AZ – Tilt-Slab Ground-Up Fabrication Facility – 100,000 SF / 2-Story Build – Directed civil, MEP, and structural phases with emphasis on safety and scheduling – $20M (Assistant Superintendent – Skanska USA)

MISSION CRITICAL INFRASTRUCTURE: Temporary & Permanent RO Water Processing Plant, AZ – Design-Build Water Filtration System – 55,000 SF Facility – Oversaw process mechanical, RO installation, and commissioning support for Microsoft Data Center network (Assistant Superintendent)

COMMERCIAL: AZ Center Refresh, Phoenix, AZ – Interior & Exterior Renovation – Multi-Building Retail Redevelopment – Coordinated construction phasing, logistics, and public safety in occupied downtown site –

OSHA, Procore, MS Projects, Excel, CPR/First Aid

Name
Max. file size: 100 MB.

Meet Your Consultant